Revolutionary continuous muck removal system with telescopic conveyor technology. Seamlessly extends with TBM advancement, ensuring uninterrupted tunnel construction with DLM's unique extendable design.
400-800m
Continuous
Seamless integration with tunnel boring machines for non-stop operation
As the tunnel boring machine progresses forward, it continuously excavates material
Stored conveyor belt automatically feeds out from the storage bin system
Muck removal continues without interruption throughout the tunneling process
No need to stop TBM for conveyor extension
PLC-controlled synchronized operation
Reduced manual work in tunnel environment
Faster tunnel completion, lower project costs
Designed specifically for continuous tunnel construction
Seamless extension without stopping tunnel boring operations
Urban subway construction with zero interruption
Advanced engineering for challenging tunnel environments
Continuous operation during tunnel advancement
Automated extension synchronized with TBM
Adaptable to various tunnel diameters
Our extendable conveyor systems ensure continuous operation and maximum efficiency