Tunnel Construction Background
Tunnel Boring Machine Integration

Tunnel Conveyor Extension Systems

Revolutionary continuous muck removal system with telescopic conveyor technology. Seamlessly extends with TBM advancement, ensuring uninterrupted tunnel construction with DLM's unique extendable design.

πŸ“¦Belt Storage

400-800m

πŸ”„Extension

Continuous

How Continuous Extension Works

Seamless integration with tunnel boring machines for non-stop operation

πŸš‡

TBM Advances

As the tunnel boring machine progresses forward, it continuously excavates material

πŸ“¦

Belt Extends

Stored conveyor belt automatically feeds out from the storage bin system

♻️

Continuous Flow

Muck removal continues without interruption throughout the tunneling process

System Benefits

Zero Downtime

No need to stop TBM for conveyor extension

Automated Process

PLC-controlled synchronized operation

Safety Enhanced

Reduced manual work in tunnel environment

Cost Efficient

Faster tunnel completion, lower project costs

Revolutionary Features

Designed specifically for continuous tunnel construction

πŸ”„

Continuous Operation

Seamless extension without stopping tunnel boring operations

  • No downtime
  • Increased productivity
  • Cost efficiency

Real-World Applications

Metro Tunnel in GuangZhou, China

Metro Tunnel in GuangZhou, China

Urban subway construction with zero interruption

Tunnel Length: 5.2 km
Duration: 18 months

Technical Excellence

Advanced engineering for challenging tunnel environments

Zero Downtime

Continuous operation during tunnel advancement

High Efficiency

Automated extension synchronized with TBM

Flexible Design

Adaptable to various tunnel diameters

Ready to Revolutionize Your Tunnel Project?

Our extendable conveyor systems ensure continuous operation and maximum efficiency